I have been trying to deploy a couple of these devices at mt remote installation. I got them up and sort of working before I left
Three days ago I tried to update the setting using Inigo. Although I have had some slows success doing this, This time the devise is stuck with a red indicator and says Changing Pending.
I imagine I am going to have tp physically power cycle the device.
Any thoughts or prayers
thanks