Finally got my Rachio up and running after we moved... The plugin integration is working great, but I'm having a tough time getting the scheduling to work the way I'd expect.

I have 2 primary schedules, each in their own action group: water lawn and run drip line. Whenever I schedule these to run on a morning schedule (e.g. Morning Watering), the "Water Lawn" fires off and immediately is replaced by "Run Drip Line." I was hoping that this would be a sequential action, queueing up each of the schedules to run in order. I could delay the action in the schedule, but that requires updates if I change the watering times on the groups. Any pointers?

This is the first time I've set up Indigo to manage my irrigation, so I may be missing a very basic understanding of how this should be set up.
Last edited by jheddings on Mon Jun 11, 2018 11:19 am, edited 1 time in total.

Posted on
Mon Jun 11, 2018 10:00 am
jay (support) offline
Site Admin
User avatar
Posts: 18199
Joined: Mar 19, 2008
Location: Austin, Texas

Re: Sequential Schedules

Nope, actions are run in parallel as much as is possible. You'll need to set a delay on the second action such that the first action completes first.